Title: Evaluation of Several Machine Learning Models for Field Canal Improvement Project Cost Prediction
Authors: Sharqi, Saadi Shartooh
Keywords: construction project duration, reliable management, prediction problem, extreme learning machine, artificial neural network intelligent models
Issue Date: 2018
Abstract: As a matter of fact, the duration of construction any project relies on several indicators such as site features, construction location, project cost, procurement methods and multiple other factors. Predicting construction project duration accurately is highly significant for completing project on time. In this research, the application of soft computing technique namely extreme learning machine (ELM) model is used to predict construction project duration. The study is carried out using several factors effecting the target duration of construction project. The implemented data set were obtained from department of construction and technical works at the Middle East Technical University. The proposed ELM model was verified in comparison with artificial neural network (ANN) model. The performance of the modeling accuracy was inspected using several statistical indicators such as coefficient of determination (R), root mean square error (RMSE), and mean absolute percentage error (MAPE). The findings of this research showed a very reliable and practical implementation for the ELM model in predicting construction project duration over the very well-known GRNN model. In more representable details, the enhancement of the (RMSE and MAPE) values for ELM model over ANN model were (51.5 and 50.8 %).
Description: Academic research
URI: http://localhost:8080/xmlui/handle/123456789/1083
ISSN: 1819-6608
Appears in Collections:الهندسة المدنية

Files in This Item:
File Description SizeFormat 
2Abstract -.pdf87.45 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.